Participants Objectives Equipment and technologies (means deployed) Initial conditions Data that are used to drive decision-making Data that support the incident Participants role Time zone Exercise structure Guidelines Planning for debriefing / evaluating/ conclusions Evaluator Key issues
Prueba Lisboa Jose Luis Domínguez Fernández, Andrés Fernandez López, María Pérez, Carlos Rodriguez Prueba Lisboa Big box, Anchoring equipment, Absorbentes This exercise to combat marine pollution will take place on June 5 and 6, 2025 on Cies Beach, in the municipality of Vigo, province of Pontevedra. The origin of the contamination is the spillage of one of the fuel tanks of a merchant ship leaving the port of Villagarcía as a result of a collision between it and a refrigerator with frozen tuna on demand from the port of La Puebla del Caramiñal for unloading.
As the Territorial Contingency Plan for Accidental Marine Pollution of the Autonomous Community of Galicia (CAMGAL Plan) is activated in the level 2 emergency situation phase, its Director requests the mobilization of resources from the State Plan for the Protection of the Seashore, integrating them into the territorial plan.
Therefore, in accordance with the SNR, in the face of marine pollution, the response resources that the Ministry has at its nearest rapid response base, located in Pontevedra, are mobilized.
42º XX,XX’N, 8º XX,XX’W
Day/Time Start
Date/Time End
Action
Lanzamento por parte da Auxiliar do R/S “IRMÁNS GARCÍA NODAL” das boia MLI para o simulacro da mancha. A posición de lanzamento é 42º XX,XX’N, 8º XX,XX’W
,
Day/Time Start
Action
Recepción dos participantes no peirao XXX
Observations
Considerase que o Servizo de Gardacostas activa o Plan Illas Atlánticas en emerxencia nivel medio e o Plan Camgal en nivel Emerxencia nivel mínimo, e ten avisado a UDAC e UOP que comeza a facer predición da posible deriva dos bidóns.
,
Day/Time Start
Action
Briefing no B/S García Nodal:
• Explicación do exercicio
• Notificación da deriva da UMO
,
Day/Time Start
Action
Chegada á zona e comezo do exercicio:
• Largado das boias derivantes
• Largado de barreira selladora na Praia do Castelo
,
Day/Time Start
Action
• Recollida da barreira
• Busca das boias derivantes
,
Date/Time End
Action
Fin do exercicio
,
Day/Time Start
Action
Debriefing
,
Date/Time End
Action
Fin
Communications
Canal VHF manobras: XX

Prueba Lisboa

Prueba Lisboa
Submitted by editor on Mon, 12/02/2024 - 14:32

Basic details

Date start
Date end
Exercise type
Exercises - Outdoors

Participants

Participants
Jose Luis Domínguez Fernández
Andrés Fernandez López
María Pérez
Carlos Rodriguez

Roles

Participant role
Role participant
Participant
Dolores Rodriguez
Role participant
Participant
Carlos Gonzalez
Role participant
Participant
Raquel Diez

Objectives

Objectives

Prueba Lisboa

Submitted by editor on Mon, 12/02/2024 - 15:02
General objective
Train the management, coordination and response to a contamination event in emergency situations due to marine pollution.
Specific objectives
Action
Determine the correct monitoring of established operational procedures, as well as response and action times with different means, and their possible optimization.
Action
Training of all personnel involved in the exercise
Action
Check logistics and capacity in responding to this type of emergency
Scope
Provide proposals for improvements in planning instruments and response operations in emergencies due to marine pollution, taking into account the conclusions derived from the exercise

Equipment

Equipment and technologies (means deployed)
Big box
Anchoring equipment
Absorbentes

Scenario

Initial conditions
This exercise to combat marine pollution will take place on June 5 and 6, 2025 on Cies Beach, in the municipality of Vigo, province of Pontevedra.
Data that support the incident
The origin of the contamination is the spillage of one of the fuel tanks of a merchant ship leaving the port of Villagarcía as a result of a collision between it and a refrigerator with frozen tuna on demand from the port of La Puebla del Caramiñal for unloading.
As the Territorial Contingency Plan for Accidental Marine Pollution of the Autonomous Community of Galicia (CAMGAL Plan) is activated in the level 2 emergency situation phase, its Director requests the mobilization of resources from the State Plan for the Protection of the Seashore, integrating them into the territorial plan.
Therefore, in accordance with the SNR, in the face of marine pollution, the response resources that the Ministry has at its nearest rapid response base, located in Pontevedra, are mobilized.

Storyboard

Time zone
42º XX,XX’N, 8º XX,XX’W
Coordinate system
ED50
Exercise events
Day/Time Start
Date/Time End
Action
Lanzamento por parte da Auxiliar do R/S “IRMÁNS GARCÍA NODAL” das boia MLI para o simulacro da mancha. A posición de lanzamento é 42º XX,XX’N, 8º XX,XX’W
Day/Time Start
Action
Recepción dos participantes no peirao XXX
Observations
Considerase que o Servizo de Gardacostas activa o Plan Illas Atlánticas en emerxencia nivel medio e o Plan Camgal en nivel Emerxencia nivel mínimo, e ten avisado a UDAC e UOP que comeza a facer predición da posible deriva dos bidóns.
Day/Time Start
Action
Briefing no B/S García Nodal:
• Explicación do exercicio
• Notificación da deriva da UMO
Day/Time Start
Action
Chegada á zona e comezo do exercicio:
• Largado das boias derivantes
• Largado de barreira selladora na Praia do Castelo
Day/Time Start
Action
• Recollida da barreira
• Busca das boias derivantes
Date/Time End
Action
Fin do exercicio
Day/Time Start
Action
Debriefing
Date/Time End
Action
Fin

Other information

Key issues
Communications
Canal VHF manobras: XX